PM time recovery
Manual coordination, supplier emails, fieldwork monitoring, and reconciliation — returned to your PMs. The largest lever, confirmed by 4 of 8 PMs reporting 10–15 monitoring hours per week.
Five operational levers — the time, CPI, and headcount the FieldworkOS gives back. Defaults recalibrated from 8 real MR project-manager responses, not industry estimates.
Operational ROI dimensions
5 levers
Primary-data calibrated
8 PMs
Recomputes as you type
Live
This is the updated FieldworkOS calculator — defaults calibrated from the 8-PM questionnaire rather than industry estimates. Tune them to your reality; the five levers recompute live.
Section A
Headcount, salary, and the manual hours FieldworkOS gives back — the largest lever (L1).
Everyone who coordinates suppliers, monitors fieldwork, reconciles.
Default $65,000 — drives time-recovery (L1) and headcount (L4).
Monitoring alone 10–15 hrs/wk (4/8 PMs), plus quote + reconciliation time.
Section B
Sample spend powers negotiation savings (L2) and the reconciliation trap (L5).
Median cluster $250K–$500K for mid-size agency PMs.
5/8 PMs negotiate on gut feel — data-driven recovery ≈ 15%.
Conservative default 20%.
Section C
Operational re-field avoidance (L3) and the PM hire you can defer (L4).
With field duration, derives annual study volume.
6/8 PMs reported re-fields ≈ 12%.
Drives the headcount-avoidance lever (L4).
FieldworkOS · ROI
Five operational levers. Set your inputs on the left, then run the numbers — results stay hidden until you calculate.
Your full ROI breakdown appears here once you calculate.
Calibrated from 8 primary PM responses
Manual coordination, supplier emails, fieldwork monitoring, and reconciliation — returned to your PMs. The largest lever, confirmed by 4 of 8 PMs reporting 10–15 monitoring hours per week.
5 of 8 PMs negotiate on gut feel or intuition with no data. Benchmarking and data-driven negotiation recover a conservative 15% of sample spend.
Operational failures — missed monitoring, late catches — drive re-fields. Validated at $7,500 per event from 6 of 8 PM responses.
Each AI-assisted PM handles far more concurrent studies, deferring the next hire as volume grows. Default: one $65,000 PM hire deferred.
When a supplier moves CPI mid-study, manual reconciliation overpays. FieldworkOS tags each respondent at the rate it was sourced — a structural fix.
Every default is backed by a real answer from the 8 MR project managers who completed the SoftSight questionnaire — quote hours, monitoring time, re-field cost, and CPI negotiation behaviour.
| Calibration input | Value |
|---|---|
PM hours recovered / PM / yr Monitoring alone 10–15 hrs/wk confirmed by 4/8 PMs, plus quote + reconciliation time | 3,200 hrs |
Quote processing hours Most PMs 2–4 hrs; Ayush >10 hrs outlier — median 4 | 4 hrs |
Reconciliation hours 6/8 PMs reported under 1 to 2–4 hrs — median 2 | 2 hrs |
CPI negotiation improvement 5/8 negotiate on gut feel — data-driven recovery | 15% |
Re-field rate 6/8 reported re-fields; ‘2–3/year’ most common | 12% |
Re-field cost per event 3/8 PMs quantified at $5K–$10K — validated midpoint | $7,500 |
Ops-driven re-field share Operational failure (missed monitoring) share for standalone view | 60% |
Headcount avoidance One PM hire deferred — default salary | $65,000 |
FieldworkOS Scale $54,000 / yr — most-popular tier modelled in this calculator | $4,500 / mo |
Twenty minutes in your browser. The walkthrough is run by someone who has lived the workflow you’re trying to leave behind — not a salesperson reading from a deck.